PROJECT FILE № PST-P21 132 kV · EAST ASIA

Babak Copper Mine Line

Construction of roughly 40 km of 132 kV overhead transmission line related to the Babak Copper Mine substation.

Babak Copper Mine Line — Powerst project FIELD RECORD · PST-P21
Specification
CategoryTransmission Line
RegionEast Asia
Voltage Class132 kV
Contract ModelPC / EPC
StatusCompleted · In Service
Delivery

Delivered within Powerst’s transmission delivery scope in the East Asia, the work runs from route survey and tower spotting through foundation, erection and stringing, to sag-tension control, clearance verification and handover at the 132 kV level.

Scope Of Work
  • Route survey, ground profiling and tower spotting
  • Foundation excavation, reinforcement and concreting
  • Lattice tower supply, ground assembly and erection
  • Conductor, shield-wire and OPGW stringing
  • Sag-tension control and clearance verification
  • Testing, commissioning and line handover