PROJECT FILE № PST-P21
132 kV · EAST ASIA
Babak Copper Mine Line
Construction of roughly 40 km of 132 kV overhead transmission line related to the Babak Copper Mine substation.
FIELD RECORD · PST-P21
Specification
CategoryTransmission Line
RegionEast Asia
Voltage Class132 kV
Contract ModelPC / EPC
StatusCompleted · In Service
Delivery
Delivered within Powerst’s transmission delivery scope in the East Asia, the work runs from route survey and tower spotting through foundation, erection and stringing, to sag-tension control, clearance verification and handover at the 132 kV level.
Scope Of Work
- Route survey, ground profiling and tower spotting
- Foundation excavation, reinforcement and concreting
- Lattice tower supply, ground assembly and erection
- Conductor, shield-wire and OPGW stringing
- Sag-tension control and clearance verification
- Testing, commissioning and line handover